This is some BS
Main Bathroom -

"Quality" install of this door. The top jamb has literally been pulled away from the side jambs so far that there is now a 3/8" gap between the top of the door and the stop moulding. Additionally, the striker side has been pulled away from the door so there's a similar gap down that side of the door. There's probably a 1/4 tube of caulk shot into the upper corners of the jamb.

The pink you see is the paint on the walls INSIDE the bathroom.