Back Hallway
This one was kind of started when the new floors went in and had been back-burnered for a while as I worked on other things. This was right after the kitchen was done and there are a LOT of drywall issues in this area. First step was to sling some mud at the bottoms of the walls to get them flat. They have really bad bows in them so I'm feathering in some mud to get them to a point the baseboard will sit properly when installed..